When long will it take to get my building?

The short answer is "it depends".

Your structure will take 5 to 7 working days to complete from the start date (not the day you order). I try to keep the next start date updated on the main page.

Delivery usually takes 1-3 weeks from the completion date in most cases (but occasionally take longer).

Smaller shelters get delivered faster (8-ft wide and 18-ft or less) because I deliver these personally.

Larger shelters are delivered by a professional full time delivery driver who delivers for many other companies. In this case the driver will handle the scheduling once I give him your information. I try to do this as soon as I can be certain of the completion date.

Want it sooner?

Order from inventory if possible.

We don't maintain a lot of inventory and only build those structures when we don't have other orders or work to do.

Order an 8-ft wide shelter no longer than 18-ft.

I can deliver these personally and delivery times are consistently faster than professional driver.

Use your own delivery driver.

You are welcome to contract with your own delivery driver to come and pick up a shelter. I will provide a credit to help offset your cost. You should be sure your driver is reliable, has experience, and can get the shed to you when they say. Payment will need to be made in advance if you use this option.

Ensure the delivery location is not over soft ground.

Wet weather often prevents deliveries due to the ground being too soft to travel over with a heavy truck and shed. If you confirm the location you are delivering to is firm it may allow a driver to deliver sooner.

image

Professional delivery driver leaving with a 10' wide.

image

My truck and trailer with a 8' x 15' ready to deliver.